EN|CH
EN|CH
Cases Case

Foshan Gaoming Shizhou Phase I Fishery-Solar Complementary Photovoltaic Power Station Project

The clear height is 3 meters, and the maximum span of the project is 42 meters. The columns are arranged on the road slopes between the fish ponds, so that the water space can be utilized in all directions and in three dimensions.

The prestressed cable truss structure has strong bearing capacity, small deflection, large span, and the upper suspension belt design principle improves the bearing capacity of the system and overcomes the problems of soft geology and insufficient horizontal bearing capacity.

The unequal span design is adopted according to the terrain to save fish pond land, with an average of 13.5 acres/MW, and improve land utilization rate by 20%-30%.


WeChat screenshot_20240123174050.png

WeChat screenshot_20240123173930.png

WeChat screenshot_20240123173950.png



Contact Us