Ningbo Lanshan Water Purification Plant Distributed Photovoltaic Power Generation Project




Project NameNingbo Lanshan Water Purification Plant Distributed Photovoltaic Power Generation Project
Application productsATEC Qingtianqing Cable Net Photovoltaic Flexible Support
Project FeaturesUnequal span design was adopted according to the factory conditions to avoid disturbing the existing buildings. The roof assembly clearance was innovatively increased to 5 meters, the assembly ground clearance was increased to 10 meters, the maximum span in the east-west direction was 40 meters, the north-south center pile was 7.6 meters, and the maximum span of the north-south center beam large space truss beam was 35 meters. At the same time, space trusses were used to span the building in some locations in the north-south direction, with a span of 34.7 meters, overcoming the problem that columns could not be arranged in the upper part of the factory building.