Shanghai Chongming Chenjia Town Fishery Solar Complementary Project
Project Name | Shanghai Chongming Chenjia Town Fishery Solar Complementary Project |
Application products | ATEC Qingtianqing Cable Net Photovoltaic Flexible Support |
Project Features | Full consideration has been given to the crab farming methods and crab living habits, and photovoltaic panels are placed in the air using field ridges. The distance between the photovoltaic panels and the water surface is increased to a clearance height of 4-5 meters. The gaps between the photovoltaic panels are reasonably arranged, the installation angle of the photovoltaic components is optimized, and the photovoltaic projection area is reduced, thus realizing a new power generation and farming model of "generating electricity on water and raising crabs underwater". |
Huizhou Ruhu Phase II Flexible Support Photovoltaic Project
Project Name | Huizhou Ruhu Phase II Flexible Support Photovoltaic Project |
Application products | ATEC Qingtianqing Cable Net Photovoltaic Flexible Support |
Project Features | With only one row of piles in the shed, the eel shed spans 60 meters from east to west and 120 meters from north to south. The modules are 4 meters clear from the ground, the maximum span of the east-west square is 35 meters, the north-south center pile is 6.8 meters, and the average is 12.5 acres/MW, which improves the land utilization rate by 20%-30%. |
Guangdong Sanshui Fishery-Photovoltaic Integrated Ecological Project
Project Name | Guangdong Energy Foshan Sanshui Nanshan Town Photovoltaic Composite Project 150MW |
Application products | ATEC Qingtianqing Cable Net Photovoltaic Flexible Support |
Project Features | This project is a fish pond project with a span of 42 meters + unequal spans. It adopts a flexible three-cable (five-cable) structural system. The disturbance is L/60 under the limit state. The lowest point of the support is not less than 3 meters from the pond bank, and the east-west pile spacing is 42 meters. |